Reinstallation

  1. Remove the cover of the new discharge connection unit.
  2. Restore the electrical connections.

UZ+ cable

F10:2

UZ- cable

X10:8

PE

PE busbar

  1. Establish a mechanical cable relief by tightening the cable glands.
  2. Mount and screw the discharge connection unit into the control cabinet at the top position of the system rail.
    The screw for the PE connection is equipped with a serrated lock washer.
  3. Mount the housing cover on the discharge connection unit.
  4. Connect the short-circuit connector to X2 to short-circuit the energy storage unit.
  5. Set fuse F10 to "On".
  6. Remove the short-circuit jumper from the energy storage unit.
  7. Reinsert the protective grid and screw it in place.