Parallel connection of the EKV
If it is necessary to increase the energy content or capacity of the energy storage system, up to three EKV energy storage bundles can be connected in parallel via an external terminal. The external terminal is not included in the scope of delivery.
Configure the parallel connection as shown in the figure. For this purpose, select suitable connection cables according to chapter Power connections ES- and ES+.

[1] | External terminal |
[2] | Fuse concept |
Connecting the signal cable
For monitoring purposes, it does not matter whether the energy storage units are connected in parallel or in series. Route the signal cables in accordance with the specifications in chapter Connecting the signal cable.