Activation after service work

After service work is completed, a visual inspection as well as a safety check in accordance with EN 60204‑1 must be carried out and recorded accordingly before restarting.

  • You have finished the service work.
  1. Remove the short circuit connector.
  2. Set the discharge fuse to OFF.
  3. Connect the grid and the controller again.
  4. Re-connect the MOVI-DPS® storage bundle using the "DC synchronization" function of the MOVIKIT® PowerMode/EnergyMode software module.