Configuring status words
Configure the status words as follows:
- An engineering connection to the inverter has been established.
- The inverter has been started up successfully.
- Start MOVISUITE®.
- In the parameter tree of the inverter, select Functions > Actual values > PI data [1].
- Assign the status words [0] and [1] of the indirect control mode to the respective process input data words [2] of the inverter.
