Configuring status words

Configure the status words as follows:

  • An engineering connection to the inverter has been established.
  • The inverter has been started up successfully.
  1. Start MOVISUITE®.
  2. In the parameter tree of the inverter, select Functions > Actual values > PI data [1].
  3. Assign the status words [0] and [1] of the indirect control mode to the respective process input data words [2] of the inverter.