Holding brake – BE.., BE.H brake or BE.. safety brake
If the result of the respective tests in the project planning procedure is negative, the following table describes the possible project planning measures for an alternative drive.
Checks | Formula | Possible measures |
|---|---|---|
Is the braking torque sufficient? | 2.1 |
|
Is the permitted no-load starting frequency of the brake sufficient? | 2.2 |
|
Are the emergency stop speed and operating speeds permitted? | 2.6 |
|
Is the vertical/horizontal emergency-stop braking work sufficient? | 2.8 |
|
Are the number of emergency stop operations and emergency stop frequency sufficient? | 2.9 |
|
Final drive check: Calculating the drive considering the selected components and their characteristic values (such as inertia). For detailed configuration criteria and procedures, refer to the SEW‑EURODRIVE project planning guidelines. | – |
|
Is the emergency-stop load on the gear unit (torque) permitted? | 2.12 |
|
Is the emergency stop load on the gear unit (overhung load) permitted? | 2.14 |
|
Is the braking distance sufficient? | 2.17 2.18 |
|
Is the deceleration permitted? | 2.20 |
|