Project planning and storage size

SEW-EURODRIVE assists with the project planning of the energy storage units. The basis for project planning is a configuration with the SEW-Workbench with the superimposed power profiles of the application in which the energy storage units are used. Furthermore, other customer requirements should also be considered for optimal project planning. These are, for example, the expected operating hours and ambient temperatures of the energy storage units, expected cable lengths, and options to be provided for storage unit disconnection and storage discharge. During project planning, the ideal operating mode, storage size, and option are determined based on the design with the SEW-Workbench and the customer's existing requirements. The project planning result is a complete list including all parameters that are relevant for subsequent startup.