Extended storage

The following table shows the intervals and measures that are relevant for extended storage of the inverters. For all other inverters, no measures are required.

Time interval

Every 2 years

Inverter with 1-phase line connection

Line connections: Connect devices to the line voltage for 5 minutes.

Measures in the event of omitted maintenance

Increase line voltage in stages. The following graduations are recommended:

  • Stage 1: AC 0 to 170 V within a few seconds
  • Stage 2: AC 170 V for 15 minutes
  • Stage 3: AC 200 V for 15 minutes
  • Stage 4: AC 240 V for 1 hour