P9-10 – P9-17 Setpoint source
Up to 8 setpoint sources can be defined for the inverter and can be selected during operation using P9-18 – P9-20. When changing the setpoint source, the new source is applied immediately during ongoing operation. The inverter does not have to be stopped for this.