Startup step
✔
Structure of the MOVISUITE®project
Create a project from a network scan.
Create a project structure in MOVISUITE®.
Axis startup
Position the horizontal drive to the left.
Open the startup assistant of the inverter (X axis and Y axis).
Configure the drive train.
Activate combined encoder evaluation in the drive train.
Perform optimization DT1.
Add MOVIKIT® StackerCrane MultiMotion.
StackerCrane startup
Open the startup assistant of the higher-level software node.
Add MOVIKIT® StackerCrane effiDRIVE.
Configure the fieldbus interface. (Start address, optional process data, decimal places)
Code generation IEC project
Open the MOVI-C® CONTROLLER configuration.
Generate an IEC Project.
Startup of IEC project
Build IEC project [F11].
Log in and download the IEC project [Alt + F8].
Start the IEC program [F5].
Generate boot application.
Load source code on MOVI-C® CONTROLLER.
Saving a MOVISUITE®project
Save the MOVISUITE® project.