Project planning procedure

The following flow diagram illustrates the procedure for configuring a MOVIONE® drive unit consisting of a gear unit, a motor and an inverter. This is a highly simplified illustration that serves to clarify the process. For example, the following points are left out:

  • Reduction of the available nominal torque at low speeds
  • Capacity utilization of the field weakening range operation
  • Project planning of a mechanical brake
  • Checking non-cyclical special loads
  • Consideration of the mass moment of inertia ratio
  • Detailed calculation of permitted overhung loads