Line cable connection

The following figure shows the topology of the synchronization of two TES31A supply units.

When you are synchronizing two TES31A supply units, both the load cables can be positioned directly in the TCS31A compensation box.

IL

Load current

[1]

2 load cables (part number 18182313)

[2]

Transmission path with TLS line cable (supply and return cable)

The following figure shows an example of the connection diagram of a transmission path with two supply units, a TCS31A compensation box (fine compensation) and a total of three TCS10B compensation boxes.

[A]

Load cable (5 × 6 mm2 including PE)

[B]

Supply cable area (line cables guided narrowly)

[C]

TLS line cable

Note that capacitive compensation of supply units in single-point parallel connection must be performed separately:

The TCS10B (special) compensation box, with about half the impedance of a TCS10B track compensation box, ensures efficient power transmission. For further information, refer to the MOVITRANS® project planning manuals.