Enabling the network
The SP master manages the enable control of the network. If the SP master receives the enable signal, all the synchronization stations switch from the status "Output stage inhibited" to the status "Output stage enabled".
The prerequisite for this is that there is no fault and each station reports the status "no enable".
INFORMATION
