Notes on PE connection
- Install the PE connection cable to the connection box as follows (screw tightening torque: 2.0 – 2.4 Nm).
- Observe the following notes for the PE connection.
Non-permitted mounting | Recommendation: Mounting with forked cable lugUse the specified material for the assembly that is included in the accessory bag. Permitted for all cross sections | Mounting with solid connecting wire or litz wire with conductor end sleeveUse the specified material for the assembly that is included in the accessory bag. Permitted for cross sections up to maximum 2.5 mm2 |
---|---|---|
[1] | Install the PE connection cable between both U-shaped mounting panels. |
[2] | Incorrect installation sequence |
[3] | Forked cable lug suitable for M5 PE screws |
Additional information