Belt – 10 PD per belt
The process input data are structured in the same way as the process data Telescope – 10 PD and are appended to the process data as shown in the following table.
Word | Associated object |
---|---|
PI 23 to PI 32 | 1st belt |
PI 33 to PI 42 | 2nd belt (optional) |
PI 43 to PI 52 | 3rd belt (optional) |
PI 53 to PI 62 | 4th belt (optional) |