Inspection and maintenance intervals
The following table shows the inspection intervals:
Time interval | Required steps | Who is permitted to perform the work? |
|---|---|---|
Each time the inverter is disassembled | Visual inspection of the gasket between the connection box and the inverter: The gasket must be replaced in the event of damage. | SEW-EURODRIVE Service |
Additional information