Project planning procedure

The following flow diagram illustrates the project planning procedure for a MOVIMOT® performance drive unit consisting of gear unit, motor and inverter. This is a highly simplified illustration that serves to clarify the process. For example, the following points are left out:

  • Operation above nominal motor speed
  • Project planning of a mechanical brake
  • Checking non-cyclical special loads
  • Checking the startup conditions for operation without encoder
  • Project planning of external braking resistors
  • Consideration of the mass moment of inertia ratio
  • Detailed calculation of permitted overhung loads