Project planning procedure
The following flow diagram illustrates the project planning procedure for a MOVIMOT® performance drive unit consisting of gear unit, motor and inverter. This is a highly simplified illustration that serves to clarify the process. For example, the following points are left out:
- Operation above nominal motor speed
- Project planning of a mechanical brake
- Checking non-cyclical special loads
- Checking the startup conditions for operation without encoder
- Project planning of external braking resistors
- Consideration of the mass moment of inertia ratio
- Detailed calculation of permitted overhung loads