ES7., AS7. checklist

Checklist for (E)DR..80 – 132/(E)DRN80 – 132S motors with ES7., AS7. encoders

Performed task

Completed

Encoder pin coated with NOCO-Paste

––□

Central retaining screw [B] of the encoder tightened (tightening torque 2.75 Nm ±6%)

––□

New expansion anchor [362] pressed into the fan guard [35]

––□

Retaining screws on the torque bracket [A] tightened into the expansion anchor [362] (tightening torque 1.6 Nm ±10%)

––□

Connection cover [619] screwed in place (tightening torque 2.25 Nm)

––□

Wobble measurement performed (tolerance ≤ 0.07 mm)

––□

Safety cover [361] or, if necessary, the forced cooling fan [170] installed

––□