Project planning example for checking the total resistance
The following example shows the check necessary for the maximum permissible total resistance with a required motor overload of 250% and a 400 V supply system.
The following components/devices are taken into account:
- Supply cables
- Conductor rails
- Transformer
- 5 MDR91B-0750-.. supply and regenerative modules
Additional information