Flow chart for FCB 58 block-shaped – MDR91B
Activation or deactivation is carried out by the customer via FCB 58 (TRUE = activate, FALSE = deactivate). A requirement for activation is that the device is free of errors and that the precharge inhibit (**X13 PCE/PI1/5) is not active (bridge X13 closed/low active).
tl | Start point of the charging process. The charging time via the 24 V voltage supply is approx. 6 to 7 s DC link voltage: 0 – 500 V |
* | Default setting (terminals, I/O signals, and process data) |
** | The highlighted area is an automatic process that is active until the message "MDR DCL ready" is issued. |
Output and input signals must be wired by the customer.
