Installation topology (PA hybrid installation example)
The following figure shows the basic PA hybrid installation typology with a hybrid cable for line voltage and 24 V backup voltage. The communication cable and the optional STO signal are led separately to the device.
[1] | Connected drive units with/without digital interface |
[2] | Decentralized drive units or decentralized inverters in communication design DFC or DSI |
[3] | PA hybrid cable for line voltage and 24 V backup voltage |
[4] | Max. permitted cable length of the STO cable between safety relay and the last inverter: 100 m. |
[5] | Max. permitted cable length of the fieldbus cable between the inverters: 100 m. |