Controller optimization with combined encoder evaluation in the inverter
Startup step | ✔ |
|---|---|
| |
Determine load inertia. |
|
Optimize the speed controller. |
|
Activate external encoder. |
|
Apply suggested value for time constant and P gain of position controller. |
|
Test the application (startup is completed if the test is successful. Otherwise, continue with the following steps). |
|
Deactivate external encoder. |
|
Determine the time constant. |
|
Activate external encoder. |
|
Optimize position controller. |
|
Test the application (startup is completed if the test is successful. Otherwise, continue with the following steps). |
|
Perform extended optimization measures. |
|