Connection of the motors for group drives or multi-motor drives

For group or multi-motor drives, SEW-EURODRIVE recommends looping the motor cables through the motor terminal box (DAISY CHAIN installation).

Note the following information:

  • Connect the motor phases of the individual motors in parallel.
  • Connect the connection cores of the individual brake coils in parallel.
  • Connect the temperature sensors in series.

Make sure that you do not exceed the permitted total length of all motor cables connected to the inverter (sum of all individual cables).