Restart

Measurement of a low-impedance connection of the protective earth (against PE busbar)

Test current: ≥ 0.200 A
Pass criterion: Protective earth/transition resistance < 20 mΩ – missing measuring points: mark "not applicable"

Item
no.

Measuring point description/BMK

Test current

 

Protective earth resistance

 

Assessment

 

Note

 

OK

Not
OK

01

Module 1PE screws on the module.

 

 

 

 

 

02

Module 2PE screws on the module.

 

 

 

 

 

03

Module 3PE screws on the module.

 

 

 

 

 

04

Module 4PE screws on the module.

 

 

 

 

 

05

Module 5PE screws on the module.

 

 

 

 

 

06

Module 6PE screws on the module.

 

 

 

 

 

07

Module 7PE screws on the module.

 

 

 

 

 

08

Module 8PE screws on the module.

 

 

 

 

 

09

Protective grid

 

 

 

 

 

10

Cabinet door

 

 

 

 

 

11

TOP mounting plate

 

 

 

 

 

12

BOTTOM mounting plate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Insulation resistance

RINSUL > 1.0 MΩ (in acc. with EN 60204‑1)

Test voltage: 1 kVDC
Test time: Measured value acquisition after 1 minute
Test steps: Electronics/PE to each adjacent circuit

Make sure that, for the entire duration of the tests, fuse F10 is set to ON and the short-circuit connector is plugged in.

DSK+

 

PE

____ MΩ

 

DSK-

 

PE

____ MΩ

-K1

 

PE

____ MΩ

 

-K2

 

PE

____ MΩ

-Q1

 

PE

____ MΩ

 

________

 

________

____ MΩ