Preparing startup
- Check the installation of the inverters and the encoder connection.
- Make sure that the voltage supply of the controllers and all axes is activated at the same time.
- When starting the controller, check whether all configured axes are switched on and participate in SBusPLUS communication. If this is not the case, SBusPLUS does not start up (slave count error).
- Observe the installation notes in the documentation of the respective devices and software components.
- The devices to be taken into operation are displayed in MOVISUITE®.